Rockland Rd Bridge Replacement

Replacement of the bridge carrying Rockland Road over the Des Plaines River will be part of a future project. The Village and Township have selected a consulting engineering firm to perform the Phase I Engineering (planning stage). The start of this work is pending IDOT’s approval of the engineering contract. It is currently anticipated that the replacement of the bridge will occur no sooner than 2022 and possibly not until 2023.